Lean Six Sigma Green Belt Certification Training – Signature Series

After completing this course, participants will have learned to:

Topic 1

What is Quality (Introduction)

  • Understand the history of quality
  • Gathering the voice of the customer
  • Garvin’s five definitions of quality
  • Definitions of quality from quality gurus
  • Differences in quality between products and services

Topic 2

Enterprise-wide View (Introduction)

  • Understand the history of continuous improvement
  • Six Sigma as a Value
  • Six Sigma as a Measure
  • Six Sigma as a Metric
  • Rolled Throughput Yield
  • Six Sigma Approach
  • Six Sigma Process
  • Six Sigma System
  • Six Sigma System

Topic 3

Lean (Introduction)

  • Understand the history of Lean and the value it brings to an organisation
  • The philosophy and goals of Lean Manufacturing
  • Understand how Lean integrates with Six Sigma

Topic 4

Six Sigma Roles and Responsibilities (Introduction)

  • Understand Six Sigma key players
  • Understand team stages in six sigma projects
  • Understand the different modes of team communication

Topic 5

Understanding the Define Phase of Six Sigma (Define Phase)

LSS Green Belt Define Phase – The Define Phase of the DMAIC methodology is constructed to introduce the fundamentals of Lean Six Sigma.

  • Describe the two stages of the Define phase<

Topic 6

Six Sigma Important Stakeholders (Define Phase)

  • Describe the stakeholders in Six Sigma projects
  • Understand how the changeover to Six Sigma implementation affects stakeholders

Topic 7

Voice of the Customer (Define Phase)

  • Understand the importance of the Voice of the Customer is Six Sigma projects
  • Comprehending the Voice of the Customer

Topic 8

Critical to Quality Flowdown (Define Phase)

  • Understand the definition and purpose of Critical to Quality
  • Understand the Critical to Quality steps or flowdown

Topic 9

Performance Metrics (Define Phase)

  • Explain what performance metrics are and they can be used to measure the effectiveness and efficiency of a process and establish goals for a project’s anticipated outcome
  • Explain the difference between process and business metrics
  • Explain the impact of the cots of poor quality (COPQ)
  • Know what questions to ask to determine the quality of the performance metrics

Topic 10

Project Charter (Define Phase)

  • Understand the purpose of a project charter
  • Understand the requirements and the elements of a project charter
  • Know how to phrase a problem statement
  • Know what questions to ask to determine the quality of the performance metrics

Topic 11

Wrap Up & Action Items (Define Phase)

 

Topic 12

Processes and Process Characteristics (Measure Phase)

LSS Green Belt Measure Phase – The Measure Phase of the DMAIC methodology is constructed to introduce important Lean Six Sigma tools for characterising your business issues.

  • Define a process
  • Explain different types of processes
  • Explain different process characteristics

Topic 13

Process Maps and Flow Chart (Measure Phase)

  • Understand how to create a process map
  • Understand the different types of process maps
  • Describe process flow metrics and how they are used

Topic 14

Data Types and Measurement Scales (Measure Phase)

  • Describe the difference between attribute and variable data
  • Understand the difference between continuous and discrete data
  • Understand the difference between nominal, ordinal, interval and ratio scales
  • Know how to express data in different scales

Topic 15

Data Collection (Measure Phase)

  • Understand how to choose different data collection methods
  • Know how to use check sheets and when to use different types of check sheets
  • Understand the advantages and disadvantages of automated gauging
  • Know how to code data and the advantages and disadvantages of coding data
  • Understand the concepts of data integrity and accuracy

Topic 16

Sampling Strategies (Measure Phase)

  • Understand the concept of sampling and the different types of sampling strategies
  • Apply probability sampling strategies
  • Apply non-probability sampling strategies
  • Know how to calculate and determine sample size for continuous and discrete data

Topic 17

Fishbone Diagram (Measure Phase)

  • Understand the purpose and meaning of the Ishikawa or Fishbone diagram
  • Apply the Fishbone diagram
  • Apply non-probability sampling strategies
  • Know how to calculate and determine sample size for continuous and discrete data

Topic 18

Relational Matrix /Prioritisation Matrix (Measure Phase)

  • Understand that a relational matrix is a tool used to measure which of the input variables has the greatest effect on output
  • Know when and how to use a relational matrix
  • Understand the differences between the X-T matrix and the Quality Function Deployment (QFD)

Topic 19

Basic Statistics (Measure Phase Module)

  • Explain the various statistics used to express location and spread of data
  • Describe the characteristics of a Normal Distribution
  • Explain the measures of dispersion
  • Understand and use measures of symmetry
  • Explain the Central Limit Theory
  • Explain frequency distribution

Topic 20

Graphical Methods (Measure Phase)

  • Understand how to construct histograms and differences in distribution shape
  • Construct a histogram using Minitab
  • Construct a stem and leaf plot
  • Construct a box plot
  • Construct a run chart
  • Explain the significance of P values in relation to hypotheses
  • Compare graphical methods and decide which is best to use

Topic 21

Gauge R and R (Measure Phase)

  • Understand the concept of gauge repeatability and reproducibility
  • Understand the concepts of accuracy, precision, linearity, stability and bias
  • Apply Gauge R and R
  • Apply Gauge R and R regression analysis

Topic 22

Process Capability Analysis (Measure Phase)

  • Understand causes of variation
  • Estimate Capability for Continuous Data
  • Describe the impact of Non-normal Data on the analysis presented in this module for Continuous Capability
  • Estimate Capability for Attribute Data

Topic 23

Wrap Up & Action Items (Measure Phase)

 

Topic 24

Graph and Data Analysis (Analyse Phase)

  • Construct a scatter diagram
  • Understand correlation and regression analysis
  • Apply the method of least square
  • Apply a simple linear regression model
  • Apply multiple linear regression analysis

Topic 25

Multi-Vari Analysis (Analyse Phase)

  • Perform a Multi-Vari Analysis
  • Interpret and a Multi-Vari Graph
  • Identify when a Multi-Vari Analysis is applicable

Topic 26

Intro to Hypothesis Testing (Analyse Phase)

  • Articulate the purpose of Hypothesis Testing
  • Explain the concepts of the Central Tendency
  • Be familiar with the types of Hypothesis Tests
  • Statistical inference
  • Understand the concepts between statistical and practical significance
  • Calculate point and interval estimations
  • Calculate margin of error and sample size
  • Calculate confidence intervals

Topic 27

Hypothesis Testing Normal Data (Analyse Phase)

  • Determine appropriate sample sizes for testing Means
  • Conduct various Hypothesis Tests for Means
  • Properly Analyse Results
  • Be able to conduct Hypothesis Testing of Variances
  • Understand how to Analyse Hypothesis Testing Results

Topic 28

Hypothesis Testing Non-Normal Data (Analyse Phase )

  • Conduct Hypothesis Testing for equal variance
  • Conduct Hypothesis Testing for Medians
  • Analyse and interpret the results
  • Calculate and explain test for proportions
  • Calculate and explain contingency tests

Topic 29

Pareto Charts (Analyse Phase)

  • Explain the objectives of a Pareto chart
  • Construct a Pareto chart
  • Test proportion = specified value
  • Test if two proportions are equal

Topic 30

Failure Mode and Effects Analysis (Analyse Phase)

  • Explain the of conducting FMEA and its various elements
  • Explain and calculate Risk Priority Number
  • Understand procedures involved in conducting FMEA
  • Understand differences of design and process FMEA
  • Explain advantages and disadvantages of conducting FMEA

Topic 31

Non-Value Added Activities (Analyse Phase)

  • Understand the seven types of process waste
  • Understand the difference between value and non-value added activities
  • Identify non-value added activities from process maps

Topic 32

Value Stream Mapping (Analyse Phase)

  • Understand VSM process and symbols used
  • Create a Value Stream Map
  • Understand the difference between cycle time and takt time
  • Know when to use Lean Systems
  • Construct a spaghetti chart
  • Outline the benefits of VSM

Topic 33

Wrap Up & Action Items (Analyse Phase)

 

Topic 34

Generate New and Re-used Solutions (Improve Phase)

LSS Green Belt Improve Phase – The Improve Phase of the DMAIC methodology is constructed to introduce important Lean Six Sigma tools for properly controlling solutions.

  • Generate solution ideas
  • Apply six thinking hats to evaluate solutions
  • Understand the role of bench-marking solutions
  • Understand the concept of process entitlement

Topic 35

5S (Improve Phase)

  • Understand the 5 concepts in the 5S model
  • Understand the effect of 5S on improvements

Topic 36

Evaluate and select top solution (Improvement Phase)

  • Understand the approach to design and implement a solution
  • Prepare process maps that reflect the desired state
  • Understand the concept of poka-yoke (mistake proofing)
  • Understand the steps to pilot the top solution

Topic 37

Designing Experiments (Improve Phase)

  • Understand the concept of experiment design and the terminology
  • Describe the difference between a physical model and a DOE model
  • Explain an OFAT experiment and its primary weakness
  • Shown Main Effects Plots and interactions, determine which effects and interactions may be significant
  • Create a Full Factorial Design

Topic 38

Kaizen and Kanban and Theory of Constraints (Improvement Phase)

  • Understand the concept of Kaizen and Demming cycle and a Kaizen event
  • Understand the concept of Kanban and the Push vs Pull system of production
  • Know how to create strategic buffer
  • Understand the Theory of Constraints and the five focusing steps

Topic 39

Wrap Up & Action Items (Improve Phase)

 

Topic 40

Statistical Process Control – SPC (Control Phase )

  • Describe the elements of an SPC Chart and the purposes of SPC
  • Understand how SPC ranks in defect prevention
  • Describe the special cause detection rules
  • Design subgroups if needed for SPC usage
  • Understand the differences between Attribute and Continuous Control Charts
  • Create an I-MR control chart
  • Create an X-bar R chart
  • Create an X-bar S chart
  • Create P and Np charts
  • Create a U chart
  • Create time-weighted charts
  • Explain the purpose of a Visual Factory

Topic 41

Total Productive Maintenance (Control Phase)

  • Explain the concept of TPM
  • Understand the 8 pillars of TPM
  • Explain the benefits of TPM

Topic 42

Selecting Solutions (Control Phase)

  • Conduct a cost benefit analysis to select the best solution
  • Understand the requirement to reanalyse the measurement system
  • Understand how the Lean tools depends on each other
  • Understand how tools must document the defect prevention created in the Control Phase

Topic 43

Control Plan (Control Phase)

  • Understand the purpose of a Control Plan
  • Understand the purpose of a documentation plan
  • Understand the concept of lessons learned

Topic 44

Wrap Up & Action Items (Control Phase)